Part 36: Mechanical Enclosures and Building Wrap

(Introduction, Syllabus, 1.Prelims, 1-4Precon, 2. Excavation, 3.Foundation, 4.Framing, 5.Close-In, 6.Roofing, 7.MEP, 8.Finish)
 
Professional builders continually reassess the close-in schedule as tasks are completed to keep the work organized, prevent conflicts, and maintain efficiency.
Close-In Phase – Insitebuilders 
When ready, the emphasis is on the tasks that need to be completed before wrapping the building with a vapor barrier and beginning preparations for the installation of the doors and windows.

Task 3 and 4: Mechanical Enclosures Mechanical enclosures are hung from the framing on the outside of the building at the point of penetration through the outside walls.
Close-In Phase – Insitebuilders
The idea is to protect and insulate the controls and service lines from inclement weather and keep mechanical equipment outside the interior floor space.
Close-In Phase – Insitebuilders
Future repair and replacements are less intrusive when mechanical equipment is located outside the perimeter of the building. In addition, combustion air, moisture, and sound are easier to control.


Close-In Phase – Insitebuilders
Protection is especially important when solar exposure increases the potential for damage to equipment, ductwork, or service lines. In areas where there is a chance of freezing, sensitive supply and drain lines are insulated and extend well below the frost line.

Task 5: Building Wrap
Most energy codes require a building wrap to help prevent drafts and the leakage of conditioned air out through the perimeter walls. These are synthetic materials made from high-density polyethylene fibers and designed to prevent air and moisture penetration.
Close-In Phase – Insitebuilders 
The building wrap is nailed or stapled to the exterior surface with overlaps at the seams and corners. Openings in the walls are first ignored and covered, then cut and folded back around the edges of the opening (See Dupont Tyvek).
Once installed, the sheathing and interior framing are protected by a water resistant barrier and the perimeter walls are ready for the installation of the doors and windows.
 
(To be continued…)

---------------------------